THE GREAT MULLARD MAGIC BLOG — VALVE ASSEMBLY
VALVE TYPES & MANUFACTURING TECHNIQUES (xiii) - B7G & B9A VALVE ASSEMBLY GOES ON AND ON - VALVE BASE PREPARATION
Posted by STEVE M on
With the electrode cage sorted, the next stage was to prepare the valve base. In the valve build described - the DF91 - this has a B7G glass base, the manufacture of which was the subject of an earlier blog entry where we left the valve base as a glass button having seven composite wires, each comprising of a valve pin, a seal and an electrode support wire, all very nice, but an electrode cage cannot be mounted on the valve base as it stands. The valve base prep team had to first prepare the base using a special machine...
- Tags: MULLARD, VALVE ASSEMBLY
VALVE TYPES & MANUFACTURING TECHNIQUES (xii) - B7G & B9A VALVE ASSEMBLY CONTINUED - ELECTRODE CAGE ASSEMBLY II
Posted by STEVE MYCIUNKA on
We last left valve assembly where we had formed the electrode cage, today, we will describe what happened next in the valve assembly process. Before the electrode cage could be mounted on the valve base, four additional components needed to be added and welded into position. The first two components were the top and bottom screen plates and projecting tags which are welded through onto tags on the outer screen as per the photo below: - The third extra component is an L shaped piece of metal which is first welded to the bottom screen plate and then bent over...
- Tags: MULLARD, VALVE ASSEMBLY
VALVE TYPES & MANUFACTURING TECHNIQUES (xi) - B7G & B9A VALVE ASSEMBLY - ELECTRODE CAGE ASSEMBLY
Posted by STEVE MYCIUNKA on
In previous blog entries we have seen how many individual valve components were made, now we will look at how they were assembled. For component manufacture, we also saw how many automated production machines were utilised, however, when we come to valve assembly, things were quite different in that manual dexterity utilising just hand tools and a few light jigs are essential - yes - your valve was truly 'hand made'. Another difference is that component manufacture and the final stages of valve making - pumping, sealing and testing - were done at the two main Mullard factories at...
- Tags: MULLARD, VALVE ASSEMBLY