Mullard Magic: For All Your Vintage Valve and Radio Needs!
1000uF 25V RADIAL CAPACITOR, LONG LEAD, ECON, HAWNT HOUSE BRAND, NOS
0.033uF @ 400V, MULLARD C296 TYPE, CRL, CENTRALAB MANUFACTURED
0.1uF 100V, Polyester Film Capacitors, Pack of 100X
1000uF 250V SNAP IN RADIAL CAPACITOR
150 + 300uF @ 300V WKG, LEMCO, DUAL SECTION, ELCTROLYTIC CAPACITORS, AXIAL
1x Sun 47uF @ 450V, axial, electrolytic capacitor